PROJECT DETAILS
ABOUT THIS PROJECT
The Work includes trench excavation, pipe installation, bedding, trench backfill, excess material disposal, and temporary roadway reinstatement for transmission and trunk/rider mains as shown on the plans.
The pipeline work to be constructed under this CWP-003B is between:
- WTP to Judge’s Hill Junction and Tank Site
- Judge’s Hill Junction to Medapathana Low Tank Site with side-work to Pingarawa and Keselkotuwa Tanks
- Connection to the existing Badulla Hospital service line
- Pipeline cut-in to feed Udawela Tank Site
- Additional work includes a separate tie-in from the Mediriya Intake-to-Eladaluwa WTP pipeline to the new Rock Hill Raw Water Sump and booster pump station.